Underground Cable 100km 132kV for Substation Interconnection

Varadero (Cuba)

Country

Cuba

Year

2013

Location
Products
Description

The project has seen the laying and start-up of a line cable 132kV with double circuit of 100km for the interconnection of a high-voltage (HV) substation in the Varadero Casco Histórico with other high-voltage substations. The present installation has been carried out between the Casco Histórico and Palmeras areas.

Related projects

MV Transformation cabin 40.5kV for photovltaic system

Artemisa (Cuba)

Design, construction and commissioning of a grid connection cabin, STC-Kiosk, for a 7MW photovoltaic plant located in the Province of Artemisa.

N. 3 MV/LV Transformation cabins for photovoltaic systems

Pontinia and Scoppito (Italy)

We have designed, constructed and supply our compact substations STC-Kiosk which power two photovoltaic plants in Pontinia and Scoppito (Italy).