Equipment for Electrical Substation 34,5kV 1250kVA

Artemisa (Cuba)

Country

Cuba

Year

2018

Description

On the Cuban territory, in the province of Artemisa, it has been carried out a project aimed to supply electric energy to the port area, well-known both for being a holiday destination and a business hub.

The project has included the design, supply and construction of four gas-insulated (GIS) medium-voltage (MV) metal-enclosed cubicles 36kV 630A 16kA 60Hz, ATR-Ring type, a power transformer 34,5kV 1250kVA 60Hz, fuses, RTU panel for the supervision and remote control. The auxiliary service equipment has been integrated into a compact substation.