We found 32 projects of Switchgear MV GIS - ATR Ring
MV Transformation cabin 34.5/0.48kV for oil plant
Havana (Cuba)
The project has involved the supply and installation of ISO containers 34,5/0,48kV 630kVA, for the oil plant in Havana.
Equipment for Electrical Substation 34,5kV 1250kVA
Artemisa (Cuba)
On the Cuban territory, in the province of Artemisa, it has been carried out a project aimed to supply electric energy to the port area, well-known both for being a holiday destination and a business hub.
MV E-House 34.5kV for industial district
Artemisa (Cuba)
The project, carried out in the industrial district called “National Center” located in Artemisa, has consisted of the supply of materials, products and systems, for the installation of medium-voltage distribution STC-Box shelters.
N. 2 Transformation cabin 34.5kV
Jardines del Rey (Cuba)
Design, supply and implementation of the n. 2 compact substations 34,5kV in the Jardines del Rey area, located in Camagüey.
Reactors and Medium-Voltage (MV) Switchgears for electrical substations
Jardines del Rey (Cuba)
Supply of materials and auxiliary accessories for the set-up of four reactors for the delivery of electricity in theJardines del Rey area in the province of Ciego de Ávila, in Cuba.
Medium–Voltage (MV) switchgears 36kV for the Expansion of Electrical Substation
Artemisa (Cuba)
In the province of Artemisa, a highly inhabited Cuban region, the supply of medium-voltage switchgears 36kV aimed to expand the electrical substation for the “Zal” logistics activity zone.
Medium-Voltage Switchgears (MV) ATR-ring 36kV 630A 16kA
Artemisa (Cuba)
The project has been carried out in Artemisa, an important industrial center in Cuba.
N. 61 Transformation cabins for the electrical grid
Havana (Cuba)
The ambitious realization has the aim of increasing the electric grid in the Cuban capital.
N.7 Photovoltaic Plants for a total Power of 15 MW
Granma, Pinar del Rio, Ciego da Avila, Santiago de Cuba, Guantanamo (Cuba)
The project, which has allowed to produce energy locally, has included n. 7 photovoltaic plants located in 5 different Cuban provinces: Granma, Pinar del Rio, Ciego da Avila, Santiago de Cuba and Guantanamo.
MV Transformation cabin 34.5/0.48kV for energy distribution
Moscow (Russia)
The project consists of an e-house for energy distribution, addressed to a Russian client.
N. 2 photovoltaic plants with a total power of 5 MWp
Camagüey, Mayajigua (Cuba)
The project is addressed to n. 2 photovoltaic plants: Camaguey and Mayajigua with a total power of 5 MWp.
N. 6 Transformation cabins 13.8kV and 34.5kV for electrical grid
Havana (Cuba)
The project has involved the engineering, construction and supply of n. 6 STC-Kiosk, which have been integrated into the Cuban public grid. These small size substations have been refined with high-resistant painting, suitable for Caribbean humid and saline environments, and customized with internal equipment.
MV E-House 36kV for public lighting system
Havana (Cuba)
The project is an STC-Box designed for the electrical supply of public lighting systems, covering a vast area in Cuban provinces.
N. 4 MV E-Houses 34.5kV for industrial area
Havana (Cuba)
The project was addressed to the developing industrial center of Artemisa and included the engineering study, construction, and commissioning of compact substations for energy distribution and electrical equipment for the substation interconnection.
MV E-House 4.16kV for oil plant
Nafoora (Lybia)
The project includes the design, construction, and commissioning of a compact and modular substation STC-Box and it is addressed to an oil plant in Nafoora, Sirte Bay, in Lybia.
Electrical equipment for rooftop photovoltaic system 1.8MWP
Artemisa (Cuba)
Our engineers and technicians have studied, designed and assembled electrical equipment addressed to a rooftop photovoltaic system 1.8MWP in an industrial area in Artemisa (Cuba).
N. 3 MV Transformation cabins 13.8kV for the new boulevard in Varadero
Varadero (Cuba)
The project consists of three transformation cabins addressed to the new Varadero boulevard, in Cuba. It is located in one of the main arteries of the famous Cuban tourist center, where shops and restaurants will be able to carry out their business also thanks to the electricity grid implemented by the C.R. Technology Systems team.
N. 62 E-Houses 13.8kV and 34.5kV for electrical grid
Havana (Cuba)
Design, realization and supply of STC-Kiosk electrical substations for secondary distribution, aimed to implementing the national grid of the entire island of Cuba.
MV E-House 36kV for Artemisa development area
Artemisa (Cuba)
Designed, construction and supply of n. 2 modular, pre-assembled and fully tested STC-Box cabins, for the expansion of a power plant serving the industrial area of Artemisa, in Cuba.
MV E-House 36kV for Artemisa development area
Artemisa (Cuba)
The Distribudora III project is addressed to an industrial district in Artemisa, in Cuba, and it is part of a collaboration work started in 2015.
MV/MV indoor substation 34.5/13.8kV 10MVA
Matanzas (Cuba)
In the Cuban area of Matanzas, to grant the increasing demand for electricity during the tourist season, we realized an electrical substation that guarantees high technological performances together with a harmonious impact in the landscape context.
N. 10 E-Houses 34.5kV for temporary applications
La Havana (Cuba)
It is a customized project to provide temporary energy in building sites in Cuban provinces, wherever is needed.
N. 2 Transformation cabins for industrial areas
Artemisa (Cuba)
Design, construction, installation of n. 2 STC-Kiosk transformation centers with ring configuration addressed to industrial areas in Cuba.
MV E-House 17.5kV for floating solar plant
Alqueva (Portugal)
Study, design, and construction of an IP54 2×2.5MVA E-House, STC-Box, destined for the floating solar system in Alqueva, Portugal.
N. 12 Skid transformation cabins for photovoltaic system
Trévago (Spain)
N. 12 transformation cabins STC-Skid 6MVA 30/0,8-0,8kV for a photovoltaic system in Spain.
MV Transformation cabin 40.5kV for photovltaic system
Artemisa (Cuba)
Design, construction and commissioning of a grid connection cabin, STC-Kiosk, for a 7MW photovoltaic plant located in the Province of Artemisa.
STC-Skid transformation cabins 20kV
Rovigo (Italy)
The project consists of n. 6 STC-Skid transformation cabins 7.2MW addressed to a photovoltaic system in Rovigo (Italy).
N. 2 Transformation cabins and n. 2 switching stations for PV greenhouses
Oristano (Italy)
The project includes the design, manufacturing, and supply of n. 2 Transformation Cabins STC-Box and n. 2 Delivery Cabins for two photovoltaic greenhouse plants, in Oristano (Sardinia).
STC-Skid transformation cabins 4,8MVA
Padua (Italy)
Design, manufacturing and commissioning of plug-in Skid transformation cabins destined for a photovoltaic plant in the beautiful location of Monselice (Padua).
Elevating substation 0.44/13.8-11.4kV for generators
Rio de Janeiro (Brazil)
For Enel Brazil, we have designed, manufactured and supplied an elevating substation 0.44/13.8-11.4kV with advanced coupling systems for generators addressed to Rio de Janeiro.
Transformation cabin 34,5kV 1500kVA for development areas
Artemisa (Cuba)
Design, manufacturing and commissioning of compact transformation cabin, STC-Kiosk, 1500kVA 34,5kV /400-230V for a Vietnamese client addressed to the new production line of a hygiene factory in the development area of Artemisa province, Cuba.
STC-SKID transformation cabins 6MVA et 4MVA
Bucharest (Romania)
Design, manufactoring and commissioning of n. 3 STC-Skid plug-in substations for a photovoltaic system in Romania.