MV E-House 36kV for photovoltaic system

Macchiareddu, Cagliari (Sardinia)

Country

Italy

Year

2022

Description

Plug-in electrical substation, connected to a large photovoltaic system in the industrial district of Macchiareddu (Sardinia), for the implementation of the electrical grid.

Design, construction, and commissioning of a switching station STC-Box, equipped with:

  • MV air-insulated electrical switchgear ATR 36kV 2000A 25kA with rotary line disconnectors
  • LV switchboard Euro-SDS
  • Battery
  • Auxiliary transformer
  • HVAC system
  • Auxiliary equipment
We have also carried out electrical equipment to be integrated into a cement structure:
  • N. 15 ATR switchgear cubicles 36kV 1250A 25kA with rotary line disconnectors
  • LV switchboards Euro SDS
  • Auxiliary transformer
  • Auxiliary equipment
It has been carried out for our sister company CR Project Service SRL, which engaged in the project and in the realization of the new substation of the "BLUSOLAR UNO" photovoltaic plant.

Related projects to eHouse

MV eHouse 33KV for battery energy storage system 100MW

Pillswood (United Kingdom)

The project includes the deisgn, manufacturing and supply of nr. 2 E-Houses 33kV, equipped with ATR switchgear 36kV 1250A 20kA(1s) for Pillswood BESS plants 100MW.

N. 2 MV E-House 24kV and 36kV for photovoltaic plant

Assemini, Loc. Macchiareddu (Italy)

The project was carried out in an electrical substation for the delivery of high voltage (HV) power, situated inside a photovoltaic plant, in one of the most important industrial centres of the southern Sardinia.