Engineering talks

View all engineering talks

MOBILE SUBSTATIONS FOR RURAL AREAS

The demand for mobile substations in the international electrical market is constantly increasing. They are a flexible solution, as mobile substations are completely assembled and tested in the production plant, thus ensuring higher quality of the product and a strong reduction of the construction phase on site.

Their considerable versatility and ease of transport can offer a reliable service even in rural and isolated locations, where carrying out plant works would result inconvenient. The recent development of these areas has made it necessary to implement an efficient electrical grid and to ensure a continuous supply of energy.

For these reasons, in rural areas mobile substations become the main solution, thanks to their peculiarities:

  • Quick installation time
  • Quick commissioning phase
  • Portability
  • Tailor-made project (through customized configurations according to the client’s needs)
  • Easy installation (plug & play)
  • Significantly reduced delivery times compared to standard solutions

The solution proposed by C.R. Technology Systems integrates the sophisticated SCADA software that, through the remote control and automation system, allow monitoring and intervening from the control room, without the need to intervene on site and cause network disruptions.

C.R. Technology Systems has a large experience in the supply of equipment for the development of the electrical grid in rural and isolated areas. For years, it has studied the environmental and climatic features, in order to set up the most sustainable solutions and to evaluate the choice of the most suitable materials in these locations. An added value is the careful training of staff, trained to deal with any problems that may arise, relating to installation and monitoring.

Case studies

https://www.crtsgroup.com/en/projects/n-2-mobile-substations-132kv/
https://www.crtsgroup.com/en/projects/high-voltage-mobile-substation-110-20-kv-40-mva/
https://www.crtsgroup.com/en/projects/mobile-substation-115-13-8-kv-10-mva/