Underground Cable 100km 132kV for Substation Interconnection

Varadero (Cuba)

Country

Cuba

Year

2013

Location
Products
Description

The project has seen the laying and start-up of a line cable 132kV with double circuit of 100km for the interconnection of a high-voltage (HV) substation in the Varadero Casco Histórico with other high-voltage substations. The present installation has been carried out between the Casco Histórico and Palmeras areas.