Underground Cable 100km 132kV for Substation Interconnection
Varadero (Cuba)
Country
Year
Description
The project has seen the laying and start-up of a line cable 132kV with double circuit of 100km for the interconnection of a high-voltage (HV) substation in the Varadero Casco Histórico with other high-voltage substations. The present installation has been carried out between the Casco Histórico and Palmeras areas.
Related projects
N. 4 Power Transformers 40.7MVA in total
Tiranë (Albania)
The project has been carried out in Albania, in collaboration with the local company OSHEE.
MV Transformation cabin 34.5/0.48kV for oil plant
Havana (Cuba)
The project has involved the supply and installation of ISO containers 34,5/0,48kV 630kVA, for the oil plant in Havana.