It is a customized project to provide temporary energy in building sites in Cuban provinces, wherever is needed.

We have carried out n. 10 portable e-Houses with the following features:

  • N. 3 portable transformation cabins 100kVA 34.5/0.220/0.127kV
  • N. 5 portable transformation cabins 150kVA 34.5/0.220/0.127kV
  • N. 2 portable transformation cabins 300kVA 34.5/0.220/0.127kV
The cabins are equipped with:
  • MV GIS switchgear ATR-Ring 34.5kV 630A 16kA
  • LV switchboard Euro-SDS
  • Power transformers LV/MV
  • Coils and coil cages

The e-Houses are designed to be easily moved from one plant to another, according to the demand for energy. To ensure safety and quick handling, the plug-in STC-Kiosks are mounted on a draggable self-supporting skid platform and are provided with hooks for lifting. Moreover, they are supplied with unwinder coils and input cable doors for an easy connection to the grid.
These features allow avoiding civil works on-site and saving time for multiple connection operations.
Each cabin is equipped with lighting and power outlet services, and they are supplied wired and tested, ready to connect and include all safety signaling to the people who operate the cabin.

Related projects to Transformation cabin

N. 6 Transformation cabins 13.8kV and 34.5kV for electrical grid

Havana (Cuba)

The project has involved the engineering, construction and supply of n. 6 STC-Kiosk, which have been integrated into the Cuban public grid. These small size substations have been refined with high-resistant painting, suitable for Caribbean humid and saline environments, and customized with internal equipment.

Renewable for Africa – Ivory Coast

Abidjan (Ivory Coast)

The project was carried out thanks to the donation offered to the government of the Ivory Coast, to provide power to a photovoltaic system, used for the extraction and purification of groundwater.