N.2 HV/MV Substations 110/7.3kV 8MVA

Çemericë, Korçë (Albania)

Country

Albania

Year

2016

Description

The project has seen the implementation of 2 high-voltage to medium-voltage electrical substations in Çemericë and Korçë.

Each plant includes transformers 110/7,5kV 8MVA, gas-insulated circuit breakers,123kV disconnector, provided with an outdoor earthing knife switch, multipole current transformer, inductive voltage transformer, protection and control panel (Euro P&C), surge arrester 123kV.