N.2 HV/MV Substations 110/7.3kV 8MVA
Çemericë, Korçë (Albania)
Country
Year
Description
The project has seen the implementation of 2 high-voltage to medium-voltage electrical substations in Çemericë and Korçë.
Each plant includes transformers 110/7,5kV 8MVA, gas-insulated circuit breakers,123kV disconnector, provided with an outdoor earthing knife switch, multipole current transformer, inductive voltage transformer, protection and control panel (Euro P&C), surge arrester 123kV.
Related projects to Electrical substation
HV/MV Substation 110/34.5 kV 25MVA
Artemisa (Cuba)
The project has involved the study, construction and start-up of an electrical substation in the province of Artemisa, in Cuba.
HV/MV Substation 110/34.5kV 2x25MVA
Varadero (Cuba)
The project has included the study, installation and supply of the electrical substation "Punta Hicacos".