HV/MV Substation 110/13.8kV 40MVA

Havana (Cuba)

Description

Realization of a high-voltage to medium-voltage electrical substation in a historic thermoelectric plant in Havana.

The project has included the engineering study, construction and commissioning of a high-voltage substation 110/13,8kV 40MVA. It includes 110kV circuit-breakers, disconnectors, transformers, surge arresters, n. 18 medium-voltage (MV) Normal Clad switchgear cubicles 13,8kV, low-voltage (LV) Euro P&C switchboards for the protection and automation of the plant, low-voltage Euro SDS switchboards for the measurement and energy distribution, 3-phase reactors, plant lighting system, firefighting system, auxiliary electrical equipment.

Related projects to Electrical substation

Electrical installation works for industrial plant

Pieve Vergonte (Italy)

The project has included the works to expand the high-voltage (HV) electrical substation serving the Hydrochem Srl plant in Pieve Vergonte (Piedmont).

MV Substation 13.8kV

Cayo Santa Maria (Cuba)

Design, construction and commissioning of a medium-voltage (MV) indoor electrical substation 13,8kV 2000A 25kA containing n. 22 air-insulated (AIS) medium-voltage (MV) Normal Clad switchgear cubicles, a low-voltage (LV) switchboard Euro-SDS 380/220V 60Hz, SCADA system for the control of the plant.