N. 61 Transformation cabins for the electrical grid

Havana (Cuba)

Country

Cuba

Year

2015

Description

The ambitious realization has the aim of increasing the electric grid in the Cuban capital.

The project has involved the carrying out and start-up of the following transformation centers with radial conjugation:

  • Nr. 3 STC-Kiosk 24 13.8kV 100kVA nominal voltages on low-voltage side 220V
  • Nr. 10 STC-Kiosk 24 13.8kV 150kVA nominal voltages on low-voltage side 480V
  • Nr. 5 STC-Kiosk 36 34.5kV 150kVA nominal voltage on low-voltage side 480V
  • Nr. 1 STC-Kiosk 24 13.8kV 500kVA nominal voltages on low-voltage side 220V
  • Nr. 1 STC-Kiosk 24 13.8kV 500kVA nominal voltages on low-voltage side 415V
  • Nr. 2 STC-Kiosk 24 13.8kV 400kVA nominal voltages on low-voltage side 220V
  • Nr. 3 STC-Kiosk 24 13.8kV 400kVA nominal voltages on low-voltage side 480V
  • Nr. 11 STC-Kiosk 36 13.8kV 500kVA nominal voltages on low-voltage side 220V
  • Nr. 1 STC-Kiosk 36 34.5kV 750kVA nominal voltages on low-voltage side 415V
  • Nr. 3 STC-Kiosk 36 34.5kV 1500kVA nominal voltages on low-voltage side 415V
It also includes transformation centers with ring configuration:
  • Nr. 6 STC-Kiosk 24 13.8kV 1250kVA nominal voltages on low-voltage side 415V
  • Nr. 2 STC-Kiosk 24 13.8kV 1000kVA nominal voltages on low-voltage side 415V
  • Nr. 1 STC-Kiosk 24 13.8kV 750kVA nominal voltages on low-voltage side 415V
  • Nr. 6 STC-Kiosk 24 13.8kV 630kVA nominal voltages on low-voltage side 220V
  • Nr. 1 STC-Kiosk 24 13.8kV 150kVA nominal voltages on low-voltage side 415V
  • Nr. 1 STC-Kiosk 36 34.5kV 400kVA nominal voltages on low-voltage side 480V
  • Nr. 2 STC-Kiosk 36 34.5kV 630kVA nominal voltages on low-voltage side 480V
  • Nr. 2 STC-Kiosk 36 34.5kV 1000kVA nominal voltages on low-voltage side 480V
  • The compact substations also contain medium-voltage (MT) metal-enclosed ATR-Ring switchgears 3.8kV 16kA up to 2000A and 13.8kV and 34.5kV 16kA up to 1500kVA with a frequency of 60Hz, low-voltage (LV) switchgears Euro PC and fire-fighting system.

    Related projects to Transformation cabin

    MV/LV Cement transformation cabin 15/0.8kV for photovoltaic system

    Cuneo (Italy)

    We have carried out an STC-Kiosk transformation cabin, destined for a photovoltaic system in the province of Cuneo, in Piedmont.

    Photovoltaic Plants 10MWp

    Venegas, Matanzas, Camagüey, Mayajigua (Cuba)

    The project includes n. 4 photovoltaic plants, with a total of 10MWp, located in 4 sites, situated in 3 different provinces of the Cuban Republic. It is part of the implementation plan of the Cuban economic development program, with the aim to reach a total of 700MW photovoltaic power supply by 2030.