N. 61 Transformation cabins for the electrical grid
Havana (Cuba)
Country
Year
Description
The ambitious realization has the aim of increasing the electric grid in the Cuban capital.
The project has involved the carrying out and start-up of the following transformation centers with radial conjugation:
- Nr. 3 STC-Kiosk 24 13.8kV 100kVA nominal voltages on low-voltage side 220V
- Nr. 10 STC-Kiosk 24 13.8kV 150kVA nominal voltages on low-voltage side 480V
- Nr. 5 STC-Kiosk 36 34.5kV 150kVA nominal voltage on low-voltage side 480V
- Nr. 1 STC-Kiosk 24 13.8kV 500kVA nominal voltages on low-voltage side 220V
- Nr. 1 STC-Kiosk 24 13.8kV 500kVA nominal voltages on low-voltage side 415V
- Nr. 2 STC-Kiosk 24 13.8kV 400kVA nominal voltages on low-voltage side 220V
- Nr. 3 STC-Kiosk 24 13.8kV 400kVA nominal voltages on low-voltage side 480V
- Nr. 11 STC-Kiosk 36 13.8kV 500kVA nominal voltages on low-voltage side 220V
- Nr. 1 STC-Kiosk 36 34.5kV 750kVA nominal voltages on low-voltage side 415V
- Nr. 3 STC-Kiosk 36 34.5kV 1500kVA nominal voltages on low-voltage side 415V
Related projects to Transformation cabin
MV/LV Cement transformation cabin 15/0.8kV for photovoltaic system
Cuneo (Italy)
We have carried out an STC-Kiosk transformation cabin, destined for a photovoltaic system in the province of Cuneo, in Piedmont.
Photovoltaic Plants 10MWp
Venegas, Matanzas, Camagüey, Mayajigua (Cuba)
The project includes n. 4 photovoltaic plants, with a total of 10MWp, located in 4 sites, situated in 3 different provinces of the Cuban Republic. It is part of the implementation plan of the Cuban economic development program, with the aim to reach a total of 700MW photovoltaic power supply by 2030.