Retrofit of the Busduct in a Thermoelectric Power Plant

Matanzas (Cuba)

Country

Cuba

Year

2018

Description

The project has been carried out in record time in the Cuban city of Matanzas and has included design, installation and supply of the busduct and its auxiliary transformer for a thermoelectric power plant.

Realization of an aluminum cylindrical busduct, protected by a covering that connects the generator to the power transformer.

Related projects to Electrical substation

HV/MV Substation 110/34.5kV 40MVA

Holguín (Cuba)

Engineering study, construction and commissioning of an outdoor electrical substation HV/MV 110/34.5kV 40MVA for the implementation of the new tourist center of Ramón de Antilla, in Holguín.

N.2 HV/MV Substations 110/7.3kV 8MVA

Çemericë, Korçë (Albania)

The project has seen the implementation of 2 high-voltage to medium-voltage electrical substations in Çemericë and Korçë.