MV E-House 35/20/10kV for industrial district
Peshkopi (Dibër) - Albania
Country
Year
Description
Design, construction and supply of a medium-voltage (MV) compact substation in Peshkopi, industrial area of the Albanian city Dibër.
The project has involved the design and implementation of a compact substation STC-Box 35/20/10kV, which includes medium-voltage metal-enclosed ATR switchgears 12kV, 24kV and 39kV, an auxiliary transformer, a low-voltage (LV) switchgear 400V 160A 10kA, power transformer 12MVA 35/20/10kV, DC system, earthing system and auxiliary services.
Related projects to eHouse
eHouse 33kV for PV plant expansion
Viterbo (Italy)
We have designed, manufactured and supplied an eHouse intended for the expansion of the photovoltaic plant in Montalto di Castro, Italy.
HV/MV Mobile Substation 110/20kV 40MVA
Fushë-Krujë (Albania)
Development and supply of a mobile substation 110/20kV for transformation and primary distribution 40MVA, carried out in the geographical area of Fushë-Krujës. It involves the supply of electricity for the benefit of a population of over 40,000 inhabitants.