Medium-Voltage (MV) Normal Clad Switchgears 7,2kV 630A 20kA (3s)

Donetsk (Ukraine)

Country

Ukraine

Year

2012

Description

The project has involved the implementation of Normal Clad switchgears, addressed to an important industrial, steel and chemical hub in the city of Donetsk.

It has included the study, construction and implementation of n. 16 air-insulated (AIS) medium-voltage Normal Clad switchgears 7,2kV 630A 20kA (3s).

Related projects

HV/MV Mobile Substation 115/13.8 kV 10MVA

Aragua (Venezuela)

The project has involved the study and construction of a mobile substation 115/13.8kV 10MVA, with a frequency of 60Hz, with the aim of guaranteeing the supply of electricity in a rural area of Venezuela.

EHouse and n. 4 transformation cabins for Photovoltaic plant

Macchiareddu (Italy)

Project realised in Macchiareddu, within a photovoltaic park in Sardinia in one of the most important industrial hubs. This is an area of development increasingly powered by alternative energy, where CR Technology Systems has already been present for some years in the realisation of green projects in the area.