N. 7 MV E-Houses 24kV for generator plants

Guacara e Tucacos (Venezuela)

Country

Venezuela

Year

2010

Description

The project was carried out in Guacara and Tucacas, tourist cities located in Venezuela. It has seen the implementation of several compact substations, destined to Hyundai generator plants.

The project has included the design, implementation, and supply of electrical equipment, addressed to two different areas:

  • In Guacara were supplied n. 4 STC-Box shelters, with Normal Clad cubicles 13.8kV 2000A 31.5kA, with a frequency of 60Hz for the diesel power station consisting of n. 56 units 1700kW each.
  • In the city of Tucacas, were supplied n. 3 STC-Box shelters, with Normal Clad cubicles 13.8kV 2000A 31.5kA, with a frequency of 60Hz for the diesel power station consisting of n. 48 units 1700kW each.

Related projects to eHouse

Nr 2 eHouse 33kV switching station – Bumper for BESS

Ilmer, Princess Risborough (UK)

We are currently engaged in a new project, involving the construction of two MV Switching stations for an upcoming Battery Energy Storage System (BESS) initiative. These stations will be situated in Severalles Farm, Ilmer, Princess Risborough, UK, supplying 100MWh as storage capacity.

N. 2 MV E-Houses for the most powerful turbine in Europe

Marghera Levante (Italy)

The challenging project has included the design, construction, and commissioning of n. 2 e-Houses for the port area of ​​Marghera Levante (Venice).